The first floor is in!

This week we had to wait for the concrete parts for the first floor in part of the hall. Today the time had come and they were placed in with a huge crane. Beautiful work!

Plate by plate is lifted in so that three beautiful discussion and seminar rooms and a sanitary block with toilets are created.

The exterior cladding has been completely finished since today, so that work can start on the roof cladding from tomorrow. The safety edge on the roof has already been placed so that work can be done safely and the nets have been hung to prevent people or items from falling down.

The sun is shining, construction is going well and we believe that God will provide all materials and finances, because He has spoken that we can build this.

About Martin Koornstra

Getrouwd met Karin, 2 mooie dochters, passie voor Jezus, spreker, schrijver, trainer en een beetje gek!

Leave a Reply

Your email address will not be published. Required fields are marked *

About

  • Inspiratie

    Wij bieden inspiratie aan iedereen die werk wil maken van discipelschap en de herleving van de kerk.

    Lees verder

  • Onderwijs

    Wil je meer? We bieden vernieuwend onderwijs. Zowel Parttime als Fulltime en voor alle doelgroepen.

    Lees verder

  • Kerkontwikkeling

    Kerkopbouw

    We helpen lokale kerkleiders hun eigen kerk verder te ontwikkelen tot een Koninklijke kerk

    Lees verder

  • vrienden

    Vrienden

    Word vriend(in) en bouw met ons mee aan een koninklijke beweging en de herleving van de kerk

    Lees verder

  • Webshop

    Webshop

    Boeken, cd's of kinderwerkmateriaal? Deze producten helpen je om te groeien in je geloof en uit te delen aan anderen

    Lees verder

  • Getuigenis

    Getuigenissen

    Getuigenissen van wat God op wonderlijke wijze doet in ons land en hoe Hij bouwt aan zijn Koninklijke kerk.

    onder constructie
To top